REM BASIC-Programm Kupferspule in Brückenschaltung

REM 1 Messpunkt pro Stunde, Ausgabe in Tagen

Rem beste Variante: Sinus für Elektronen und Protonen

Defdbl a-h,k-z

Defint i,j

N1=82: N2=94: Elem=29: REM Potenz Grundwellen E, P; Kupfer

stime =-350: phas1=1440*1: phas2=0: REM Phasenverschiebungen in Minuten

schritt=4: xf=0.6: ymax=16: Null=5: REM Daten für Grafik

clicht=2.99793E+11 *60 : REM Lichtgeschwindigkeit in mm/min

lambdae=2.42611E-9: REM Comptonwellenlänge Elek. in mm

lambdap=1.32144E-12: REM Comptonwellenlänge Prot. in mm

P1=lambdae/clicht*Elem*2^N1: REM Hauptperiode Elektronen in Min.

P2=lambdap/clicht*Elem*2^N2: REM Hauptperiode Protonen in Min.

PT=24*60 : zpi=8*ATN(1): REM Tagesrhythmus Temperatur in Min.

s5=sqr(5): ff=s5: A0=ymax/2: REM s5=2.236; ff= 2 bis 2.618034

WE=zpi/P1: WP=zpi/P2: WT=zpi/PT: REM Frequenzen für E, P, und T

WE1=WE: WE3=WE1*4: WE5=WE1*16: WE7=WE1*64: WE0=WE1/4

WP1=WP: WP3=WP1*4: WP5=WP1*16: WP7=WP1*64: WP0=WP1/4

AE0=A0/2: AE1=AE0/ff: AE2=AE1/ff: AE3=AE2/ff: AE4=AE3/ff: REM Amplitude E

AP0=A0: AP1=AP0/ff: AP2=AP1/ff: AP3=AP2/ff: AP4=AP3/ff: REM Amplitude P

ATemp=(AP2+AP3)/2: REM Amplitude T

Screen 12: xmax=P2*xf: CLS: Window (0,ymax)-(xmax,0)

For x=xanf to xmax Step schritt

yT = Null + ATemp*sin(WT*(x+stime)): Pset (x,yT-3.5),12

xx=x+phas1

y0 = Null - AE0*sin(WE0*(xx-5*P1/2)): Pset (x,y0),3: REM Ne=84

y1 = Null - AE1*sin(WE1*xx): Pset (x,y1),3: REM Ne=82

y2 = Null + AE2*sin(WE3*xx): Pset (x,y2),3: REM Ne=80

y4 = Null + AE3*sin(WE5*xx): Pset (x,y4),3: REM Ne=78

y6 = Null + AE4*sin(WE7*xx): Pset (x,y6),3: REM Ne=76

xx=x+phas2

yP0 = Null - AP0*sin(WP0*(xx-P2/2)): Pset (x,yP0),14: REM Np=96

yP1 = Null - AP1*sin(WP1*xx): Pset (x,yP1),14: REM Np=94

yP2 = Null + AP2*sin(WP3*xx): Pset (x,yP2),14: REM Np=92

yP4 = Null + AP3*sin(WP5*xx): Pset (x,yP4),14: REM Np=90

yP6 = Null + AP4*sin(WP7*xx): Pset (x,yP6),14: REM Np=88

sumE=y0+y1+y2+y4+y6: sumP=yP0+yP1+yP2+yP4+yP6

sum = (yT+sumE)/6+9.8: Pset (x,sum),3

sum = (yT+sumP)/6+7.8: Pset (x,sum),14

sum = (yT+sumE+sumP)/7+1: Pset (x,sum),15: REM Gesamtsumme

Next x

Line (xanf,Null)-(xmax,Null),15

x0=320+stime+1440*1: REM 1 Tag=1440 Minuten

For i=0 to 15

For j=1 to 24

x=x0+(i*24+j)*60: READ Mess

Mess=Mess/8+5.5: REM Ausgabe Messkurve

if (j>12 or i>0) then Pset (x,Null+Mess),15

Next j

line (x-1380,Null+2)-(x-1380,Null+11),12

Next i

END

 

Data 0,0,0,0,0,0,0,0,0,0,0,0: REM Eichlinie zum Anfangswert

DATA -0.3,-0.8,-1.8,-2.5,-3.0,-3.1,-3.5,-4.2,-4.3,-4.1,-4.0,-4.0

DATA -3.8,-3.1,-2.9,-2.5,-2.0,-1.5,-1.2,-1.0,-0.3,-0.8,-1.0,-1.3

Data -1.5,-2.0,-2.1,-2.2,-2.5,-2.8,-2.5,-2.5,-3.1,-4.0,-4.8,-4.9

DATA -4.8,-4.5,-4.0,-3.7,-3.1,-2.8,-2.5,-2.2,-2.2,-2.3,-2.5,-2.35

Data -4.0,-4.5,-4.8,-5.0,-4.0,-3.4,-3.0,-4.1,-4.8,-4.8,-4.6,-4.4

DATA -4.3,-4.0,-3.8,-3.8,-3.4,-3.3,-3.2,-3.1,-2.9,-2.8,-3.2,-3.6

Data -4.0,-4.2,-4.8,-5.5,-6.1,-6.6,-7.3,-7.8,-8.4,-8.8,-9.5,-10.0

DATA -10.1,-10.2,-9.8,-9.2,-8.4,-7.9,-7.4,-6.5,-5.7,-5.6,-5.6,-5.5

Data -5.2,-6.8,-7.4,-8.3,-8.9,-9.0,-9.0,-9.1,-9.0,-9.0,-8.8,-8.6

DATA -9.0,-9.4,-9.3,-9.0,-8.5,-7.8,-7.4,-6.9,-6.6,-6.3,-6.2,-5.8

Data -5.9,-6.2,-6.0,-5.8,-5.7,-5.7,-5.9,-6.1,-6.5,-6.6,-6.8,-6.7

DATA -6.3,-6.1,-5.6,-5.1,-4.5,-4.0,-3.7,-3.4,-3.2,-3.5,-3.4,-3.5

Data -3.4,-3.5,-3.6,-3.7,-4.0,-4.1,-4.4,-4.6,-4.9,-5.3,-5.1,-5.0

DATA -4.8,-4.5,-4.2,-3.8,-3.4,-3.0,-2.6,-2.0,-1.2,-0.8,-1.0,-1.3

Data -1.6,-1.6,-2.0,-2.5,-2.8,-3.4,-3.9,-4.5,-5.1,-5.3,-5.2,-4.9

DATA -4.4,-4.0,-3.4,-2.8,-2.2,-1.6,-1.0,-0.5, 0 , 0.3, 0.4, 0

Data -0.2,-0.3,-0.1, 0.1, 0.6, 0.4,-0.1,-0.5,-0.9,-1.5,-1.8,-1.8

DATA -1.8,-1.8,-1.8,-1.7,-1.5,-1.4,-1.3,-1.1,-1.0,-1.0,-1.3,-1.6

Data -1.8,-1.9,-2.2,-2.7,-2.9,-3.0,-3.1,-3.3,-3.5,-3.6,-3.7,-3.6

DATA -3.6,-3.3,-3.0,-2.6,-2.4,-2.1,-1.9,-1.7,-1.5,-1.3,-1.4,-1.4

Data -1.6,-2.2,-3.9,-5.0,-5.8,-6.0,-6.3,-6.6,-6.8,-6.9,-6.8,-6.9

DATA -6.8,-6.6,-6.4,-6.1,-5.9,-5.6,-5.4,-5.1,-4.8,-4.3,-3.9,-3.8

Data -3.6,-3.5,-3.7,-3.9,-4.2,-4.6,-4.9,-5.3,-5.5,-5.7,-6.0,-6.2

DATA -6.2,-6.1,-5.9,-5.6,-5.3,-4.9,-4.5,-4.0,-3.6,-3.3,-3.1,-3.3

Data -3.7,-4.3,-5.3,-5.9,-6.1,-6.2,-6.2,-6.3,-6.1,-5.7,-5.0,-4.4

DATA -3.5,-3.1,-2.7,-2.4,-2.1,-1.9,-1.8,-1.7,-1.5,-1.5,-1.6,-1.7

Data -2.0,-2.5,-3.1,-3.3,-3.2,-4.0,-3.5,-2.6,-1.8,-1.0,-0.3, 0.3

DATA 0.8, 1.1, 1.0, 1.0, 0.9, 0.8, 0.8, 0.7, 0.5, 0.3, 0 ,-0.4

Data -0.8,-1.5,-2.4,-3.5,-4.3,-4.9,-5.5,-5.8,-5.6,-5.0,-4.1,-3.4

DATA -2.7,-2.0,-1.4,-0.8,-0.1, 0.3, 0.7, 1.1, 1.6, 1.4, 1.1, 0.7

Data -0.1,-0.7,-1.3,-1.8,-0.6,-0.9,-1.2,-1.5,-1.5,-1.8,-0.3,-0.1

 

Home
Gesetz
engl.
Optavy
Experiment
Hypothesen
Ordnung